New Factory Under Construction
Our company new plant covers 25000 sq meters are under construction in schedule.
Now foundation is made and building walls come out, it is planned to finish at the end of this year.
One year later in June 2024, we will move into new plant to start new developing era.

More from the workshop
Related news
Company News
16mm Stainless Slitting Line & Cut to Length Line, China
A repeat order from a China customer covers a 16 mm heavy-duty stainless slitting line and a matching cut to length line, built to the same specification.
Read more
Company News
16mm Stainless Cut to Length Line Running in Chengdu
A 16 mm stainless cut to length line is now running at a customer plant in Chengdu, China — a heavy-duty version of the 14 mm line supplied earlier.
Read more
Company News
Inside a Stainless Steel Cut to Length Line Plant
A stainless steel cut to length line levels out coil memory in two passes, then shears to length. Flatness held to 1 mm/m, cut lengths from 2 m to 12 m.
Read moreTalk to us
Working on a line like this one?
Tell us the coil or sheet you need to produce. We will come back with the configuration, the working range and the delivery schedule that fit your project.
- Material grade, thickness and coil width
- Finished strip width or cut length
- Target output and site conditions